BCI Pipeline Report: Australia (Q3 2022)

Information utilised in this report is current as of 1 October 2022.

Tentang

Laporan Pipa BCI memberikan indikator utama triwulanan tentang nilai proyek konstruksi baru pada tahap awal (dari kompetisi hingga dokumentasi). Ini adalah sumber informasi konstruksi yang penting untuk organisasi atau individu mana pun yang terkait atau peduli dengan masa depan industri konstruksi di Australia.  

Laporan Pipa BCI menawarkan lebih dari sekadar pandangan umum tentang pasar konstruksi dengan mengungkapkan tren spesifik di tingkat regional dan kategori.  

The Pipeline data is based on projects reported on a daily basis in BCI’s real-time project lead database, LeadManager. For the past nine quarters all projects at Concept or Design & Documentation stage were extracted from the database by publishing date. Only new projects (projects reported for the first time) are included. The aggregate value of the projects is then established by quarter. 

Gambar keseluruhan

TOTAL CONCEPT & DESIGN STAGE PROJECTS IN AUSTRALIA (MILLION $)

TOTAL PROYEK TAHAP KONSEP & DESAIN DI AUSTRALIA (JUTA $)

The Australian economy continued to grow at a steady pace of 0.9% in the June 2022 quarter and 3.6% on a year-on-year basis thanks to the continued favourable domestic demand and export and net trade readings. With spending on travel, services, recreation, entertainment and other coming back to life, it is expected that the GDP will further improve.  

Although total concept and design stage projects in Australia have slowed down compared to the same period last year at a decline of 8.3%, the quarter-on-quarter growth rebounded by 45.6%. In this edition, it can be observed that WA is overtaking NSW/ACT in terms of the value contribution to total early-stage projects. On the contrary, NSW/ACT leads in terms of the number of project proposals supplied for the quarter. 

CONCEPT & DESIGN STAGE BUILDING CONSTRUCTION PROJECTS (MILLION $)

KONSEP & DESAIN TAHAP PROYEK KONSTRUKSI GEDUNG (JUTA $)

CONCEPT & DESIGN STAGE CIVIL CONSTRUCTION PROJECTS (MILLION $)

TAHAP KONSEP & DESAIN PROYEK KONSTRUKSI SIPIL (JUTA $)

A noticeable improvement is seen from the civil sector this quarter due mostly to a proliferation of utilities projects across different states but most especially from WA. Among the projects that were initiated in the region this quarter are the Hyenergy Hydrogen Project (PID 291345017) in Carnarvon and the Midwest Offshore Wind Farm (PID 290622017) in Kalbarri.  

Although utilities projects feature strongly, interesting projects from infrastructure also abound, one of which is the Sydney Metro Western Sydney Airport Line – Stage 2 (PID 287301017) that is a planned rail line extension from south east Aetropolis to Glenfield via Leppington Station.  

 

To view more data for building (residential, community, education, office, industrial, retail and hospitality) and civil (infrastructure, transport, utilities) early-stage projects, download the BCI Pipeline Report.