BCI Forecaster 是未來三個月進入市場的建築合同價值的領先月度指標。施工開始值在澳大利亞範圍內呈現,按土木和建築施工以及五個關鍵州和六個關鍵建築部門/項目類別進行細分。  

通過將近期三個月前景與前三個月進行對比來說明短期預測。將 12 個月的開工建設價值與一年前相應的 12 個月期間進行對比,可以看出長期趨勢。  

BCI Forecaster 是不可或缺的短期規劃工具,可讓決策者為其銷售和運營團隊設定切合實際的目標和參數。 

Data is based on projects reported on a daily basis by BCI Central’s real-time project leads database, LeadManager. 

快照

澳大利亞開工建設(百萬 $)

澳大利亞開工建設(百萬 $)

外表

As the tight labour market and high living costs contribute to the decision to increase wages, some analysts are bracing for even higher interest rate hikes to combat inflation. This remains to be seen until the June 2023 Reserve Bank Board Meeting regarding the monetary policy decision that will be implemented next. Meanwhile, the slowdown in consumer spending is being caused by a number of factors including higher interest rates and cost of living. With these persisting economic uncertainties, the RBA’s main priority remains to be the on-target management of the inflation rate. As the RBA tries to stir inflation into the 2-3% target range, the outlook for the economy is for a continuous growth that is below-trend. Given this, a gradual increase in the unemployment rate in the future is also predicted. In the construction market, construction starts remain stable at a short-term outlook of 9% and a maintained 1% long-term trend.

建築業

澳大利亞開工建設總建築(百萬 $)

澳大利亞開工建設總建築(百萬 $)

Things are looking up for the residential sector in the short term, but the enduring trend shows below average values. It remains to be seen if the sector will recover in the near term, but in the meantime, the community sector is contributing more in terms of project value.  

Notable projects from the community sector include the VIC projects, Hanwha Armoured Vehicle Centre of Excellence (HACE) (PID 270748017) in Lara, and the Melbourne Arts Precinct Transformation Project (PID 29198010) in Southbank.  

Health projects in various locations are also figuring significantly in this edition’s reading, with hospitals such as the St. George Hospital – Stage 3 (PID 222172017) in Kogarah, NSW, the Shoalhaven District Hospital (PID 295993017) in Nowra, NSW, and the Logan Hospital Stage 2 (PID 306479017) in Meadowbrook, QLD. 

民用部門

澳大利亞開始全面土木建設(百萬 $)

澳大利亞開始全面土木建設(百萬 $)

Civil construction starts continue to be largely influenced by the mega infrastructure project, Woodside/BHP Billiton JV – Scarborough to Pluto LNG Plant (PID 158751017) in Exmouth, WA. 

Interestingly, contributions from the transport sector are more pronounced this quarter with the commencement of the Sydney Metro West TSE Works Package 1 (PID 256709017) and Sydney Metro West TSE Works Package 2 (PID 256717017) in NSW.  

The near commencement of the Sydney Metro West Eastern Tunnelling Package (PID 256730017) and the Sydney Metro Western Sydney Airport Line – Rail Stations (PID 262491017) are contributing significantly to the transport sector total as well. 

 