BCI Pipeline Report: Australia (Q2 2023)

Information utilised in this report is current as of 1 July 2023.  

關於我們  

BCI 管道報告提供了早期階段(從競爭到文檔)新建設項目價值的季度領先指標。對於與澳大利亞建築業的未來相關或關心的任何組織或個人來說,它是建築信息的重要來源。  

BCI 管道報告通過揭示區域和類別層面的具體趨勢,提供的不僅僅是建築市場的一般視圖。  

The Pipeline data is based on projects reported on a daily basis in BCI’s real-time project lead database, LeadManager. For the past nine quarters all projects at Concept or Design & Documentation stage were extracted from the database by publishing date. Only new projects in Australia (projects reported for the first time) are included. The aggregate value of the projects is then established by quarter. 

整體圖 

TOTAL CONCEPT & DESIGN STAGE PROJECTS IN AUSTRALIA (MILLION $)

澳大利亞的總概念和設計階段項目(百萬 $)

 

 

According to the National Australia Bank (NAB), business conditions increased by 3 points to 0 index points in June 2023 which signifies that there are roughly equal numbers of businesses that are optimistic and pessimistic about the future. Meanwhile, business conditions are showing resilience at an above average rate of +9 index points, which reflects an improvement in the construction sector.  

Early-stage projects for the quarter rebounded thanks to the major developments from the civil sector in terms of categories. On a by state and territory standpoint, NSW & ACT were the biggest suppliers of early-stage projects, but SA was the main source in terms of project value. 

CONCEPT & DESIGN STAGE BUILDING CONSTRUCTION PROJECTS (MILLION $)

概念與設計階段建築施工項目(百萬$)

CONCEPT & DESIGN STAGE CIVIL CONSTRUCTION PROJECTS (MILLION $)

概念與設計階段土建工程(百萬$)

 

The utilities sector keeps on going strong this edition as seen in our headline project, as well as in other major developments in different states. This is in line with Australia’s commitment to reaching net zero emissions, as well as its plan to be a world class green energy producer and exporter.  

The big contributors to this quarter’s figures aside from our headline project, are the Darwin Green Liquid Hydrogen Export Project (PID 312026017) in NT, the Offshore Windfarm Project (PID 316317017) in VIC, and the Evergreen Project (PID 315100017) in SA. 

 

Looking for more insights into new projects in Australia (July 2023)? Download the BCI Pipeline Report for building (residential, community, education, office, industrial, retail and hospitality) and civil (infrastructure, transport, utilities) early-stage project data. 