• Trang Chủ
  • >
  • BCI Pipeline Report: Australia (Q2 2023)

BCI Pipeline Report: Australia (Q2 2023)

Information utilised in this report is current as of 1 July 2023.  

Về Chúng tôi  

Báo cáo BCI Pipeline cung cấp các chỉ số hàng đầu hàng quý về giá trị của các dự án xây dựng mới trong giai đoạn đầu của chúng (từ cạnh tranh đến lập hồ sơ). Đây là một nguồn thông tin xây dựng thiết yếu cho bất kỳ tổ chức hoặc cá nhân nào có liên quan hoặc quan tâm đến tương lai của ngành xây dựng ở Úc.  

Báo cáo BCI Pipeline không chỉ cung cấp một cái nhìn chung về thị trường xây dựng bằng cách tiết lộ các xu hướng cụ thể ở cấp khu vực và danh mục.  

The Pipeline data is based on projects reported on a daily basis in BCI’s real-time project lead database, LeadManager. For the past nine quarters all projects at Concept or Design & Documentation stage were extracted from the database by publishing date. Only new projects in Australia (projects reported for the first time) are included. The aggregate value of the projects is then established by quarter. 

Hình ảnh tổng thể 

TOTAL CONCEPT & DESIGN STAGE PROJECTS IN AUSTRALIA (MILLION $)

TỔNG KẾT NỐI & GIAI ĐOẠN THIẾT KẾ DỰ ÁN TẠI ÚC (TRIỆU $)

 

 

According to the National Australia Bank (NAB), business conditions increased by 3 points to 0 index points in June 2023 which signifies that there are roughly equal numbers of businesses that are optimistic and pessimistic about the future. Meanwhile, business conditions are showing resilience at an above average rate of +9 index points, which reflects an improvement in the construction sector.  

Early-stage projects for the quarter rebounded thanks to the major developments from the civil sector in terms of categories. On a by state and territory standpoint, NSW & ACT were the biggest suppliers of early-stage projects, but SA was the main source in terms of project value. 

CONCEPT & DESIGN STAGE BUILDING CONSTRUCTION PROJECTS (MILLION $)

Ý TƯỞNG & THIẾT KẾ GIAI ĐOẠN XÂY DỰNG CÔNG TRÌNH (TRIỆU $)

CONCEPT & DESIGN STAGE CIVIL CONSTRUCTION PROJECTS (MILLION $)

KHÁI NIỆM & THIẾT KẾ CÔNG TRÌNH XÂY DỰNG DÂN DỤNG (TRIỆU $)

 

The utilities sector keeps on going strong this edition as seen in our headline project, as well as in other major developments in different states. This is in line with Australia’s commitment to reaching net zero emissions, as well as its plan to be a world class green energy producer and exporter.  

The big contributors to this quarter’s figures aside from our headline project, are the Darwin Green Liquid Hydrogen Export Project (PID 312026017) in NT, the Offshore Windfarm Project (PID 316317017) in VIC, and the Evergreen Project (PID 315100017) in SA. 

 